Browse Forums Buying Land Re: Saratoga Rise 8Sep 08, 2017 1:53 pm hey mate, Seems like you are making good progress. thanks for sharing. hmm I'm also little worried about budget and build process. However if we are clear & stick with our objective, budget, upgrade, etc... then it shouldn't be matter. My kid will around 4 year when we move there so I will be looking for school following year or same. Gables and Thehillsofcarmel have plan to open schools but who knows when? So I will be relying on other schools located in near by suburb. I know it will be challenging. I understand your point of view since your both kids are in school. However it will be good idea to look for options in near by suburb. e.g. rouse hills, kellyville, etc... or whatever you have suggested. Since it's completely new development in box hill, we have to wait till it reaches to a point where people started living there. hmm my projection is that at least in next 5 year, one or two school will be open. Also we requires child care, local shopping center, etc.. lets see not thinking much else I will confuse myself . I know this before hand as it is new development, things takes time. Keep in touch! Re: Saratoga Rise 9Oct 25, 2017 6:56 pm Does anyone here know much about zone of influence and the clearance required for footing. We bought lot 103. And this has a sewer line running 1m from the right side of boundary to the centre of the pipe. The diameter of the pipe is 150mm and it is going to be buried at minimum depth requires of 450mm.. My question is how far can i start the foundations and then this should give me maximum buildinf width of? Re: Saratoga Rise 10Oct 25, 2017 9:11 pm As I understand the zone of influence is anywhere within the area above the 45 degree angle cast from the bottom of the pipe (sewage or storm water). If this depth is 600mm (450+150) then the zone extends 600mm to either side above the pipes at ground level. If building within the zone depending on your council you may need to have piers either to the depth of the zone at that distance or to the full depth of the pipes. Some councils may refuse to allow encroachment. I would be certain to confirm actual depth 450 seems shallow? Re: Saratoga Rise 12Oct 25, 2017 9:15 pm Anyone knkw roughly how long the DA take normally for Hills district council? Re: Saratoga Rise 14Oct 28, 2017 10:32 pm Hello everyone, just wondering if anyone know how the DA for Saratoga is going? Re: Saratoga Rise 15Mar 09, 2018 1:40 pm Hello All, I am the appointed sales agent for Saratoga Rise. The DA is not yet approved, however the Developer is confident that approval is not too far off. The site Contractor, TRN has established a presence onsite. As TRN are onsite there is no access to the land. I can be contacted during 9am-9pm 7 days 0423747915 ordavid@searchfieldproperties.com.au Best regards David Glasheen David Glasheen Kahala Property Group 0423747915 Re: Saratoga Rise 17Apr 04, 2018 10:39 pm WalasFam As I understand the zone of influence is anywhere within the area above the 45 degree angle cast from the bottom of the pipe (sewage or storm water). If this depth is 600mm (450+150) then the zone extends 600mm to either side above the pipes at ground level. If building within the zone depending on your council you may need to have piers either to the depth of the zone at that distance or to the full depth of the pipes. Some councils may refuse to allow encroachment. I would be certain to confirm actual depth 450 seems shallow? +1 Maybe be best to design a house that is more than a metre from sewer. Anything less than 900mm would require encasement of the sewer. My build was just over 900mm from sewer and in the zone of influence, it required 2.3m piers along that elevation (sewer was 2.0 metres deep). In terms of cost it was around $63 per linear metre, house needed 6 of those plus 50 other piers at half that depth. In hindsight, I would have designed house further away from sewer but was too far in the process, good to know this early in the process nd plan accordingly. Re: Saratoga Rise 18May 05, 2018 10:33 pm dglasheen01 Hello All, I am the appointed sales agent for Saratoga Rise. The DA is not yet approved, however the Developer is confident that approval is not too far off. The site Contractor, TRN has established a presence onsite. As TRN are onsite there is no access to the land. I can be contacted during 9am-9pm 7 days 0423747915 ordavid@searchfieldproperties.com.au Best regards David Glasheen Thanks David Is there any updates on DA? Re: Saratoga Rise 19May 08, 2018 11:42 am Hi all, We were told that the expected land registration date for Saratoga Rise is November 2018. Just wondering if most people here have already started looking at builders or signed contracts with them? I'm not sure as to how early this needs to be done. thanks Re: Saratoga Rise 20May 08, 2018 10:19 pm Just wondering anyome here from lot 102/104? And what they r building single oe double storey? the stair balustrades? There is nothing special about these and I imagine literally every stair installer will be able to do this. 1 6711 |