anyone buying land in officer VIC(South Siding estate)?
Page 33 of 64
Stage 2.
All kirbs are finished and digging along the reservation side of the Kirbs is also done. Streets lights are laid out on the ground in their position. Lines man from respective authority can now come in to do them if the set up is finished. If they do them soon then stage can finish anytime from end April to sometimes in May.
Things are looking good for stage 2 if rain stays away.
Stage 1.
The broken street light is fixed and the wire fence is now along the front of the site office, meaning you cannot get to the site office via Pioneer Way. This means they could now be rezoning the wire fence to open up stage one to public
Nowuser_14 - We are waiting for site access for builder mainly for site costs and Linda said, she will get back on this but got to know that some builders just go in and get the job done, it really depends....
For valuation, I think it should be possible now... One of my friend in Savannah got it done without land being ready...
Just got back from overseas late yesterday and it was typical Melbourne weather so I’ll excuse Winslow for having so few workers today. Here is my observation for stage one and two.
Stage 2.
All kirbs are finished and digging along the reservation side of the Kirbs is also done. Streets lights are laid out on the ground in their position. Lines man from respective authority can now come in to do them if the set up is finished. If they do them soon then stage can finish anytime from end April to sometimes in May.
Things are looking good for stage 2 if rain stays away.
Stage 1.
The broken street light is fixed and the wire fence is now along the front of the site office, meaning you cannot get to the site office via Pioneer Way. This means they could now be rezoning the wire fence to open up stage one to public
Stage 2.
All kirbs are finished and digging along the reservation side of the Kirbs is also done. Streets lights are laid out on the ground in their position. Lines man from respective authority can now come in to do them if the set up is finished. If they do them soon then stage can finish anytime from end April to sometimes in May.
Things are looking good for stage 2 if rain stays away.
Stage 1.
The broken street light is fixed and the wire fence is now along the front of the site office, meaning you cannot get to the site office via Pioneer Way. This means they could now be rezoning the wire fence to open up stage one to public
Glad u r back ting ting ☺️☺️
Thanks for the update. I am so hoping to get the loan by end of this month as i am in the middle to switching job.. i am really worried
Good observation Ting Ting and welcome back !!! Yeah, stage 1 may soon hear good news and builders may start accessing it which might be the reason for re-zoning of fence..... Waiting to hear progress on Stage 2 now..
Nowuser_14 - We are waiting for site access for builder mainly for site costs and Linda said, she will get back on this but got to know that some builders just go in and get the job done, it really depends....
For valuation, I think it should be possible now... One of my friend in Savannah got it done without land being ready...
Nowuser_14 - We are waiting for site access for builder mainly for site costs and Linda said, she will get back on this but got to know that some builders just go in and get the job done, it really depends....
For valuation, I think it should be possible now... One of my friend in Savannah got it done without land being ready...
Have you already got the loan sorted?
After I do the final variations then I will have a final figure for the house, so no I don’t have my loan finalized. This also differs from person to person and loan to loan.
Also 24 hour security on site..
......which will include a $5000 deduction they charged for fire. I have a friend in Timber Top, he doesn’t pay the fire levy but his neighbour does. Good luck,.....
Below is a photo I posted on our facebook page.
The right hand is south siding, and is most likely not to change from this, as it adjoins a reserve area.
So about 60% of us should have our BAL removed
Fire levy reduction will be in the variation as any other adjustment we might add, or things we want to take out. Final drawings that are put through to council for permit will not be done till after title and soil test.
We are in the same position. As per the bank the loan will approved only after land valuation and which is after land entitlement. Hopefully price will remains the same or goes up. Market seems to be going up in officer and Pakenham. Fingers crossed!!
Good luck
Looks like a few people have visited stage two over the break. Wire fence has be opened in various places.
Yes!! We visited the site yesterday and the end close to rail tracks. The fences were open and at many other places. We wanted to visit but felt it was risky. But apart from the soil mountain the land and around areas look very much done. Lamp post still layed on ground!!! But it should not take that long now.
Its my feeling
They rolled the roads with the soil required before doing asphalting, which should be very soon and it will be the final layer before title.
Also, no builder I went to said you cannot have evaporative cooling. I had it in my house quote but I took it out.
Related
31/07/2023
0
Yeah I don't know why I came to a forum. Place is full of wierdos/pedos thought internet may help but I suppose I'll try my luck with someone in person. Cheers. I tried…
9/08/2023
4
Well these guys are not looking good... I sent them a written enquiry last week and they have not yet replied. If they cannot respond to a simple…
15/02/2024
3
Adam Baines Grad Cert Bldg Surv / Grad Dip Bldg Surv / MSAAPA Accredited Building Professional APB20210035 Builders Lic 183023 Pest Control Lic 84868 Ph 0412202336 PO…