Hi, just wondered what the approximate timeframe would be to have a concrete pool installed. I know a lot would be dependant on size, shape etc but just trying to get an idea. How long did yours take?
Thanks
Browse Forums Pools & Spas 1 Nov 04, 2013 11:47 pm Hi, just wondered what the approximate timeframe would be to have a concrete pool installed. I know a lot would be dependant on size, shape etc but just trying to get an idea. How long did yours take? Thanks Re: Concrete pool - average timeframe 2Nov 05, 2013 7:17 am We're in the middle of ours, but the timeframe from our builder, including fence, solar heating, paving/tiling and all plumbing and electrical is 11 weeks from the start of excavating to handover. The biggest delay is waiting for the concrete to cure (4 weeks) and then all the finishing touches. The actual excavation, formwork, steel fixing, internal plumbing and concreting was done inside 2 weeks. Re: Concrete pool - average timeframe 3Nov 10, 2013 10:20 am Our pool took 7 weeks to build including 4 weeks concrete curing period. So in effect our pool builders were on site for only 3 weeks! +Tbrown2012 Hi, just wondered what the approximate timeframe would be to have a concrete pool installed. I know a lot would be dependant on size, shape etc but just trying to get an idea. How long did yours take? Thanks Re: Concrete pool - average timeframe 4Nov 13, 2013 9:37 am varies greatly. 8 weeks - 16 weeks Depends on pool inclusions/ cleaning system (in floor?)/ Spa?/ and interior style... render or tiled or paint. Hi everyone, Looking for some advise. We are about to build an above ground pool in our backyard. There is a private sewer line running under the pool at 1.6m… 0 11759 |