Browse Forums Pools & Spas 1 Feb 14, 2013 8:03 pm AS3000 was amended in December 2012 and significant changes were made to the earthing requirements for pools. Here is a summary: Equipotential bonding conductor connection point for swimming and spa pools shall be: - located in a position that will be accessible with space for connections to be made after pool constructions (eg: pit located adjacent to pool equipment), - location identified at the switchboard at which the pool equipment circuit originates, - of suitable construction and design (for connections), - protected against mechanical damage, - protected against corrosion (note: corrosive pool chemicals). Basically the requirements for the pool slab/reo equipotential bonding connection are now similar to the existing main earth electrode requirements (accessible for testing and inspection purposes, protected against corrosion, and location marked on the main switchboard). 1. Roof cleaning and paint - which colour do you recommend? I often see black/ dark grey in use these days but I would prefer… 0 5169 In addition to protecting your children, glass pool fencing has the benefit of being simple to clean and maintain. You probably won't need anything more expensive or… 0 3038 Hi everyone, Looking for some advise. We are about to build an above ground pool in our backyard. There is a private sewer line running under the pool at 1.6m… 0 7642 |