First floor addtiion - Sequence from beginning to build
Page 1 of 1
I have a design in mind, subject to feasibility and cost.
In Sydney.
In sequence:
1. Call 5 builders to visit and get a ROUGH idea of the cost and a ROUGH idea of the design
2. Call Draftsman to prepare plans for DA or CDC. Leverage the learnings from the builder's rough design.
3. Call Structural Engineer to draw structural engineering plan
4. I complete DA/CDC application form and submit with all the artefacts produced by draftsman and Structural engineer
5. In the meantime (before the DA is approved), call builders to look at the proposed plan and give a DETAILED cost
6. (Surely the plans will need to be revised) - call Draftsman to update plans and resubmit DA
7. (once the DA is approved), call builders to start the build!
Stakeholders in the above sequence - builder, draftsman, structural engineer. Anyone else i need to call?
Is this sequence correct? I am a bit confused about what a structural engineering actually produce, but I heard they are required for DA submission?
Is this sequence correct? I am a bit confused about what a structural engineering actually produce, but I heard they are required for DA submission?
Your sequence is incorrect basically planning first then building
1 Development Application DA generally requires a site plan, geotech site report, elevations,Floor Plan, Demolition plan, etc
The Councils website should have a planning checklist
2.After receiving the approved Building Application the next step is Building application (BA)
for that you will require Energy Report, Engineering Structural Reports, Details and plans, Electrical Plans, Cross sections, Stormwater, BAL, Cabinet plans, Compliance /CDC, etc there should be a checklist for BA Submissions
Cheers
Chris
Can you please elaborate a bit more on which trade to contact to do the things you highlighted?
- site plan, geotech site report, elevations,Floor Plan, Demolition plan, etc
- Energy Report, Engineering Structural Reports, Details and plans, Electrical Plans, Cross sections, Stormwater, BAL, Cabinet plans, Compliance /CDC, etc
I know that a builder can do all these, but to save cost i would like to coordinate as much as i can (within my ability).
Stewie
Related
29/09/2023
6
Thank you. Do I use timber floorboards for stairs or do people use timber treads? Or is both the same?
12/06/2023
0
CDC Housing Code 3 When to apply Floor Area external face of wall vs Gross Floor Area internal face of wall. Reading thru CDC Housing Code 3, lets take a lot 915sqm.…
18/07/2023
1
isn't a garage level with the rest of the house a given? pretty sure they 'came around' long time ago. if you have a flat block, the garage is usually level with the rest…