How would anyone calculate total cost for the concrete footings?
Obviously, the variables I am already aware of are the amount required (and cost) of 25MpA concrete, cost of reo and cost of concrete pump.
How much should I be expecting to pay for the concreter labor for steel fixing and vibrating the concrete (I am I correct is that only vibration will be required after pumping)?
Also, does it make sense any sense to pour footings for all the future retaining walls at the same time (retaining walls themselves can be done later during landscaping)?
Thanks