Browse Forums Owner Builder Forum Re: Sydney North West Owner Builder 2Aug 08, 2017 8:46 am Jacky10 the designer should have synchronized your design with google sheets What software did they use when designing your project, BTW if they used 3D Building Information Software (BIM) the Advantages are 1. BIM is a Design & Construction (AEC) process using a 3D Model, software & automation, hardware & Construction, etc 2. The data & Info is your project from start to finish 3.Most designers use simple BIM to generate Coloured images & Elevations, This engineer/builder uses it to optimise your data & design 4 When using a 3D Model you are able to visualize & Optimised the data, ie volume in 3D space 5.You can use the Data and Model to check quotes Discussed here ie. Rebuild update Costs 6. BIM updates automatically ie make a single change everything updates 7. The data in the software is linked to google Drive cloud ie Gantt chart, Spreadsheet,forms,apps, etc 8. Google is accessible everywhere, at home ,work, on site, on mobile devices There are 2 BIM options 1. Set the initial 3D design/process up correctly so it works seamlessly all along the supply chain Design->Engineering (Data)-> Material orders-> Construction (AEC)->Google 2. Export the 3D model from the design software into the Engineering ->Construction -> Google sheets software-> Google forms You will need to ask your designer to provide the BIM File or file translation No use putting up other people's examples if you leave a PM and send a file I am happy to take a quick look & advise accordingly.good luck Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs Hi I live in a 100yr old semi and my neighbour added an additional floor last yr and our architect has advised that we can knock down our semi and build a free-standing… 0 37723 Hi, can anyone recommend a custom home builder who can build in north east area? Looking to build a custom 4-br energy-efficient home with a max budget of 750k. If they… 0 22825 |