Browse Forums Owner Builder Forum Re: Building my first home using ICF System 8Jun 06, 2016 11:40 pm Stewie D Quote: Could you please give me full names of the following: OB project DA or CDC DCP and LEP NCC BCA ICF's comply BAL restrictions OB = Owner Builder ( as opposed to employing a licensed builder to build your house ) DA = Development Application ( through your council ) CDC = Complying Development Certificate ( through NSW govt ) DCP = Development Control Plan LEP = Local Environmental Plan NCC = National Construction Code BCA = Building Code of Australia ( now superceded by the NCC but still referenced ) ICF = ICF's like all products have to comply with the AS and NCC for things like flammability resistance, durability etc ( usually stamped on the product or by visiting their websites ) BAL = Bushfire Attack Level ( depending on how close you are to major vegetation buffers ) AS = Australian Standards The fact that you are unfamiliar with any of these terms and ask the questions in your opening post suggest to me that you really should employ professionals to draw your plans, submit these to your council as a DA ( or CDC ) and then employ a builder to construct your house. The fact that none of your friends or family have any tradie qualifications and/or limited experience worries me even more. Stewie Thanks Stewie for the full terms. Yes, I am unfamiliar with any of those terms because I haven't built in Australia before and I've never owned a home. Also English is my second language. So, hopefully you all understand and give me the chance to learn what I need to learn. The reason why I decided to build my own home because I have been trying to buy a house for long time and Sydney price are so expensive that I can not afford current market prices and second reason is most of the established or new homes structures are absolute joke where I won't consider paying such money for a wooden house that require another budget for maintenance and so on. So, I have decided to build a fully concrete home as in my home country that lasts forever. I have spoken to so many builders to do ICF system but they mostly refuse or tell me "concrete house cost triple price of Australian standard homes" While I know it is not true as cement, sand, and steel are much much cheaper than timber in Australia and If will use ICF blocks, then it will require minimum number of labours. So All what I need just clear guideline on where to start from, that's all.... I have just paid a deposit today for a registered block of land and it is located in one of Sydney's new development towns. So I need to know what to do after exchanging contracts which will happen after 14 days, where to go to get started as I don't want to waste any time and keep my cost to lowest level as much as I can. From my understand I need to do the following (Please correct me): 1- I have designed my house already by myself but I still need to find an architecture to modified it according to the council requirements. The architecture should do a very minimum changes as my design is professionally done. (how much should I pay) 2- What's the architect role exactly in the whole process? What does he/she do exactly and until which stage? 3- Does the architect find me a building engineer or I have to find engineer by myself? what is the cost?? 4- Then submit DA application with local council by me or architecture. Now, Once I get all the required approvals and ready to start building. 5- Where can I find and hire labours to do the required work for me? (as you said family and friends might not be suitable) 6- Where to find best price for ready mix concrete in sydney? and how is it priced? 7- Where to find Reinforcing steel bars and right trades to join, cut and install them for me? 8- Where to get bricks from at good prices? and what to look for? Thank you and I apologize for asking many question at once. Re: Building my first home using ICF System 9Jun 07, 2016 5:30 pm Apologies if this all comes across bluntly but based on what i've read on your post, your uncertainty with all aspects of building, and your lack of trade base i wouldn't be going ahead with owner building. From someone who has just finished owner building i think you will find it incredibly hard to attain. That's without taking into account your english as a second language. You need to be able to understand 100% all plans, emails, phonecalls and be able to converse with a whole range of people and trades. You need to be amazing at scheduling! You need to be good with finances. Have you got an owner build licence? This is the first thing i would be inquiring about if you are considering it. Are your finances organised? I believe owner builders need very detailed cost itemised plans usually to borrow. StewieD makes very good points in relation to your post. I suggest you read them carefully. Re: Building my first home using ICF System 10Jun 09, 2016 9:08 am Quote: 1- I have designed my house already by myself but I still need to find an architecture to modified it according to the council requirements. The architecture should do a very minimum changes as my design is professionally done. (how much should I pay) Did you read the link I posted above Quote: What is needed to lodge a DA ( in NSW any way ) viewtopic.php?f=1&t=75671&p=1298206#p1298206 That gives you a rough idea of what is required. If all you have is a floorplan and sketch of the elevations then you need to employ a draftsman, building designer or architect to finish your plans ready to submit them to the council. They should also be able to give you a rough idea of what it should cost to build. You should post up your floorplan here for us to comment. Stewie Good questions but the best answer will be obtained by visiting (ie: interviewing) a couple of house designers and/or builders and ask them. You may find it challenging to… 2 3234 We already paid for somfy motors for the blinds. The quote above was purely for “pre-wiring” so the blinds company can install the motors and blinds. That’s why we… 5 16275 Broker here - legislation says that every true broker must put the clients best interests before theirs so in theory they must offer you the best options for you on their… 2 46013 |