Hi People, I read somewhere that a reasonable estimate for a concrete slab to be laid was to double the cost of the concrete.
Not sure if this is still applicable or it that was inclusive of the cost of concrete. Anybody have any ideas ?
We are looking at a 158 sq m slab and about 38 cu m of concrete.
I haven't got my engineering drawings back yet so I can't get a proper quote.
Thanks in advance