Browse Forums Owner Builder Forum Re: Floorplan, plumbing & electrical. 21Mar 10, 2010 1:03 pm switchboard location ( if located SEPERATELY from the meterbox ) huge price difference Hi cenemelectrical We are thinking to have this one done - what sort of costs should we expect - the meter box will be on the side of the garage the circuit breaker inside the garage. Just wondering how much to expect as we didn't ask the builder yet and only 3-4 weeks from pre-start Thanks Preliminary agreement 23/11 Contract 22/03 Prestart 06/04 - finalised on 30/04 Unconditional approval 10/05 Demolition 05/07 Slab 26/08 Brickwork 13/09-06/10 Roof frame started 07/10 viewtopic.php?f=31&t=32292 If there have been changes, variations, during construction then the drawings should be revised, the building permit amended and the current, as built drawings given to… 2 4480 2 6423 In my experience roof is essential element of the building envelope and hence a common property and should be covered by owners corporation however a detailed review of… 3 6169 |