could you help me out with an estimate. We're planning to build a basement with besser block brickwork.
I did the math and calculated the costs around $400 m2 (blocks 3.6 each, work 15$ per block, 400$ concrete per m, 50$ render per m2)
I'm I right? Or is it much cheaper
or more expensive?
site location is NSW.
Anything helps. Thank you.
kazzy
Hey
Kazzy Welcome to the forum
Start with a survey, geotech and flood report, It also helps if you have proper certified 3d engineering Bim Drawings, Basement Details and Data
The data that is specific to your project can be linked to live costs online, always cross check the data against reliable sources.
OT, The better the info you put up the better the reply + it also helps others
Cheers
Chris
Hey
StructuralBIMGuy,thanks, we'll make sure that everything is according to council regulations.
I'm after a ballpark figure for the wall/ construction work itself. How much does it cost me to get 1m2 of besser block wall build and rendered (it will be around 150m2 in the end)?
Do you have any estimate for me?
regards Kazzy