My best guess was he meant make sure we drill noggins so we can poke cable down the walls, but I thought we'd run them the same route as the power then just divert at floor level and terminate there. Not having done it before maybe that is impossible and/or stupid, suggestions?
So can anyone help me with the cabling terminology, "pull through"?