Browse Forums Building A New House Re: Acceptable Slab class ? 3Jul 07, 2020 3:06 pm ![]() Or do i accept what they are advising is acceptable. They are not advising what is acceptable, they are implying that their standard pricing only allows for classifications A, S, M and H*. You are correct that a geotechnical report will include a determination on the site classification - and yes you should request a copy if one is available. If you sign a contract and subsequently the site classification is confirmed as being E or P, a variation will likely be required to cover the cost of the additional foundation works. *Note that technically class H no longer exists - in the current (2011) version of Australian Standard 2870 the old class H was split into H1 and H2. Prior to signing any contract you should ask the builder to confirm in writing that their class "H" allowance includes both H1 and H2 classifications as defined by AS2870:2011 to avoid them playing any silly games down the track. Do you know what was mentioned in your contract or the specification attached to the build. Normally builders will specify the type of termite treatment in the… 1 668 Is class 9b building considered a commercial building? I was filling form 75 to become an OB of childcare centre (in Western Australia), it says that an OB can build a… 0 257 |