Browse Forums Building A New House 1 Jun 28, 2020 7:28 pm Hi Everyone, I am new here. Currently just started building the “Esperance” with MJH in Newcastle. I have been very happy with MHJ until today. My husband and I went to look at the progress that had been made since our slab had been poured over a week ago. I had been told by the slab supervisor that the frame would be delivered on the 25/6. I was also told by the Construction Coordinator that the site supervisor would be making contact with me once the frame was delivered. However, I received no phone call or email from the SS. I arrived on site today to see that the frame had arrived and work installing it had commenced. So my husband and I had a look around the site and noticed that the water pipes in both main and en-suite showers were not centred but close to the metal house frame. Both en-suite and main bathrooms vanity pipes had put in the wrong position and will be covered by the metal frame of the house. We haven’t been contacted by MJH to discuss this as it looks to be an error. They haven’t yet sent a tax invoice for the slab as a progress payment. Is anyone has had a similar issue please comment. It has definitely disappointed my husband and I Re: Initial slab and frame commenced 4Jul 01, 2020 2:18 pm It is pretty normal for them to run the waste pipes up through the wall even if you don't have a floating vanity. They cut the pipe flush with the slab & install a reducer before they put up the frame. Hi everyone Looking for some advice. My frame does not sit on the slab at the edge all the way around. At some parts the slab is protruding a maximum of 40mm. We… 0 2987 Get. An. Independent. Building. Inspection. Done. At. Every. Stage. 15 3611 You're right, if you buy the lot yourselves you have forever to build on it but if you're a first home buyer then you need to have a house completed and occupied in… 3 711 |