I just recieved an email with final construction drawings.
What an absolute $%^&#@* joke!!!!!!
They are still wrong.... let me count now....
one set of preliminary drawings with the wrong facade WRONG
one set of contract drawings STILL with the wrong facade WRONG
one set of copntract drawings with things that were just changed for no reason WRONG
one set of construction drawings with doors in the wrong place, wrong electrical, wrong rear vanity WRONG
The rear vanity kills me.....
they have no probelm charging nearly $2000 for the type of vanity we chose..... stone top, extra tiling, shelves..... but they changed the drawings... actually changed it from the correct layout to a normal cupboard.
WTF????????????
We have signed the contract..... but Jesus Christ. We had Final contract appointment in the first week of July. We finally signed two weeks ago.... it took that long to get everything right.
Like %^&$ they got everything right.
Now we really can't do anything because we signed.
I really feel enough is enough..... and I think I'm prepared to lose 15k deposit to walk away. I will sit on this and think about it. But at this very moment I have lost all confidence in M3tricon.
The only possibilty is that she sent through the wrong document.......
I need a drink.... anyone want to come and get sh*tfaced with me?
Jo