Browse Forums Building A New House Re: Canceling Build Contract/HIA -advice 2Apr 14, 2020 6:24 pm Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs Re: Canceling Build Contract/HIA -advice 4Apr 14, 2020 7:30 pm Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs Re: Canceling Build Contract/HIA -advice 5Apr 15, 2020 7:30 am Foremost Building Expert in Australia,assisting with building problems/disputes, building stage inspections,pre-contract review advice for peace of mind 200 blogs http://www.buildingexpert.net.au/blog Re: Canceling Build Contract/HIA -advice 7Apr 15, 2020 7:16 pm I feel in this scenario the builder should have seperated the design costings with the building contract. Therefore being paid to supply a set of drawings to build from. Disappointing they missed these items. I think DBDRV is your next step if you're not willing to pay for the drawings. What it happening with the build then? Just dropped the idea of construction? Or redesign? Registered Building - Always happy to help where I can and simply loves the game. DM me if you need help in VIC. You talk about deletions, are they variations or PS and PC adjustments? pleas list them 1 16557 10 12308 Unless there is something in special conditions the builder does not have to give you timeline. If your demolition contractor has not removed Asbestos and it was found… 12 28800 |