Browse Forums Building A New House Re: Concrete estimate was too low for slab 5Apr 12, 2020 10:46 pm Foremost Building Expert in Australia,assisting with building problems/disputes, building stage inspections,pre-contract review advice for peace of mind 200 blogs http://www.buildingexpert.net.au/blog Re: Concrete estimate was too low for slab 7Apr 13, 2020 9:28 am Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs Re: Concrete estimate was too low for slab 9Apr 13, 2020 10:31 am Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs Re: Concrete estimate was too low for slab 13Apr 13, 2020 10:07 pm Foremost Building Expert in Australia,assisting with building problems/disputes, building stage inspections,pre-contract review advice for peace of mind 200 blogs http://www.buildingexpert.net.au/blog Re: Concrete estimate was too low for slab 15Apr 14, 2020 11:57 am Foremost Building Expert in Australia,assisting with building problems/disputes, building stage inspections,pre-contract review advice for peace of mind 200 blogs http://www.buildingexpert.net.au/blog Re: Concrete estimate was too low for slab 17Apr 15, 2020 8:40 am Foremost Building Expert in Australia,assisting with building problems/disputes, building stage inspections,pre-contract review advice for peace of mind 200 blogs http://www.buildingexpert.net.au/blog Re: Concrete estimate was too low for slab 19Apr 17, 2020 9:49 am ![]() ![]() Normally quantity of concrete used is never an issue unless there is a provisional sum adjustment I've had blow outs in excavation with rock that has really thrown the estimate of the final concrete. Conventionally you can get it spot on or within reason. Excavation blow out is not measured, it's builders risk. Foremost Building Expert in Australia,assisting with building problems/disputes, building stage inspections,pre-contract review advice for peace of mind 200 blogs http://www.buildingexpert.net.au/blog Also, your main savings will be coming from cost of renting the pump and minimum order for the concrete. 2 4079 Are those "all in" costs including earthworks, set out, plumbing? If it is just for formwork, reo, concrete and finish then probably a bit on a high side. If it… 3 1398 Yes. I’m just wondering if I can go back to the builder to fix this quoting Au standards or best practice. 2 761 |