Browse Forums Building A New House Re: Coral Bahama 50 - heavily modified 2Nov 20, 2019 6:12 am 3in1 Supadiverta. Rainwater Harvesting Best Practice using syphonic drainage. Cleaner Neater Smarter Cheaper Supa Gutter Pumper. A low cost syphonic eaves gutter overflow solution. Re: Coral Bahama 50 - heavily modified 6Nov 23, 2019 8:25 am Bonybon5902 Tthe contract signing was a dogs breakfast, with so many mistakes. Doesn’t give you much hope of them getting the build correct. This isn't unusual and is industry wide. A lot of new home buyers don't have their contract checked . The contract and build quality are separate. The build quality will depend heavily on the professionalism of the SS but many working for other project builders have up to 20 and sometimes more constructions under their control at the one time. This doesn't apply to all builders and I don't know if Coral follows this approach but it is a question worth asking. Just remember that several trades build a house and it is impossible for the ss to be expert at them all, the reason many new home buyers contract an experienced building consultant to do vital stage inspections. Having a competent CCTV cam inspection of the stormwater and drain (sewer) pipes done by an independent plumber to check for foreign objects, pipe damage and slope pre final inspection is wise. 3in1 Supadiverta. Rainwater Harvesting Best Practice using syphonic drainage. Cleaner Neater Smarter Cheaper Supa Gutter Pumper. A low cost syphonic eaves gutter overflow solution. Ask the council if there is a chance of getting build over easement exemption. Sometimes easements are unused and 24cm is not all that much. Good luck. And yes any builder… 2 13771 In Qld it is a requirement that a builder must have a cost breakdown, for building a home to the same specification, with the same inclusions and the same finish. So ask… 1 4340 |