Browse Forums Building A New House 1 Sep 18, 2019 6:03 pm Hi I had my concrete slab poured on Monday. It started raining around 12 hours after a gloomy day. It has been raining continuously 2 days straight. The rain is not falling hard and heavy all the time but more like continuous drizzle with in between heavier rain. According to weather forecast it would be another 5-6 days before the rain stops. I have been told that it is good thing. This is the first house build for us and I am concerned. Should I be? The bottom of the downpipe has been taped (see the black tape) to seal the necessary gap between the downpipe and the adaptor that would normally prevent the downpipe… 3 9242 The concreter will take and reuse. In my case I bought structural LVLs and scraped them back and used them as joists. 1 5160 Hi, does anyone have any experience with using Trex rain escape or EPDM rubber to waterproof a deck so you have dry space underneath. Popular in the US and realize that… 0 3450 |