Browse Forums Building A New House Re: Fall on Land and Site Cost 8Aug 20, 2019 5:37 pm I think it would be hard to find a builder to fix the site costs before the engineering is complete. Try and have a chat to a handful of builders and see what they all come back with. If you can get them fixed that would be great, but please remember when they fix the site costs before the engineering is complete they are estimating for the worst case scenario to cover their back side. Thank you Splashers. Tomorrow I might check if I can get a few packs of 300x300 in the same tile finish. It may be good to use these could in the shower recesses. I'm not… 4 4670 I've got a challenge here. Background is the builder has cut too deep for the slab and the slab is now below the very substantial retaining wall. It's failed occupancy… 0 18364 We were lucky in that our old house was so small (86 square metres) compared to the new house, they were able to take enough readings around the old backyard house before… 8 36901 |