Hi
We are trying to get a list of items required by the builder if we go ahead with the variation to supply powerpoints and switches. The builder has refused to provide a list of items required by them as per follows:
As far as the electrical list of items goes, this is not something we provide when client is supplying the product. I would suggest you look at the electrical plan for the list of items required and quantises as this is what will be wired for onsite as per the plan.
Does this seem a little petty as I would have thought if they are happy for the items to be provided they would have wanted to make sure they get everything correct? I would also have expected they had the list as a way to calculate the provisional sum which they have said will not change - we have added electrical items since the PS was provided.
Is my builder just trying to be difficult for the fun of it?