Browse Forums Building A New House Re: House slab 2Jun 11, 2019 8:42 am Separate concrete pours mean there is a construction joint and that may create a termite entry risk Foremost Building Expert in Australia,assisting with building problems/disputes, building stage inspections,pre-contract review advice for peace of mind 200 blogs http://www.buildingexpert.net.au/blog Hi all, Trying to workout the minimum stepdown required between slab for my house and the outdoor alfresco area. Garage is 100mm lower than rest of the house and plan was… 0 3657 13 4649 Thanks for the insights, that makes perfect sense, and yeah, I will be leaning on the experience of the excavator operator entirely. 6 11061 |