Hi guys,
We are looking at building the Bentleigh 48 with Metricon, we've been told the promotion finishes tomorrow (17/01/2019).
We have a quote with most of our upgrades, we will possibly do the floors after handover.
Just wondering how much people have spent upgrading on tiles and fittings etc. at the Stuio M appointments.
Thanks guys