Browse Forums Building A New House 1 Sep 28, 2018 9:00 am Re: Coral build found rock 2Sep 28, 2018 7:20 pm Almost everyone gets ripped off for rock excavation either the way it is measured and calculated or if indeed it is classified as excavation in rock. Get someone who knows and it will cost you hundreds or skip it and it will cost you thousands or perhaps tens of thousands. Your call. Foremost Building Expert in Australia,assisting with building problems/disputes, building stage inspections,pre-contract review advice for peace of mind 200 blogs http://www.buildingexpert.net.au/blog Re: Coral build found rock 3Sep 29, 2018 2:56 pm In my coral contract for a knock down, site costs were fixed at contract. The only exception was that they wanted to do another soil test post excavation. No variation to cost. What stage are you up to with them ? M Y C U S T O M C O R A L B R O N T E 43 ...............Kitchen! 16 Nov 2016 https://forum.homeone.com.au/viewtopic.php?f=31&t=79581 Re: Coral build found rock 6Oct 01, 2018 7:18 am Tash801 We have a start date of October 10. I read our contract and it said all site costs are fixed excluding rock. Hoping ours is the same then cass I hope so to... they found so much rock on my block, more where they installed the Taylex tank. But our ss said it’s only if they have to use explosives. I hope it all goes well not long till your start date 😁😁 The significant date is when receive final payment invoice Check that section of contract Bit of fluff by builders prior to that 1 15952 Hi all, I have been looking at land in South Australia, that is on a slope however most of the core excavation is complete, with a flat area to place a house. The agent… 0 1415 Ask the council if there is a chance of getting build over easement exemption. Sometimes easements are unused and 24cm is not all that much. Good luck. And yes any builder… 2 13781 |