Browse Forums Building A New House Re: Building on Slope -right to left 1.25m- land - suggestio 8Aug 16, 2018 7:07 am ratna I wouldn't proceed too far beyond the architects Sketch Without preliminary engineering Data and Construction costs Slab & Formwork Costs Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs Need advice on the backyard plan above. Should I excavate and cut all of the dirt to level with the house slab or semi-excavate as per photo above? Both left and right… 0 24865 Hi All, We have recently purchased a sloping block (3.5m fall building envelope, 6m overall). Just wondering if you know of any good builders that you would recommend for… 0 1774 you need a fridgie to answer but I would think you vac the whole system then add gas if you have a leak, unless it is new install with the gas already loaded, in that case… 1 3657 |