Browse Forums Building A New House 1 Apr 27, 2018 8:44 pm HI, i building Glendale 45 home with Metricon. They charge me $ 19800 for slab upgrade M to H2 and $ 3900 for site cut and fill.My block is pretty flat and almost dead level but they charge me .My soil test report is P class..Pleas give me advise and help me .Thanks Thanks for the insights, that makes perfect sense, and yeah, I will be leaning on the experience of the excavator operator entirely. 6 16106 4 6194 The concreter will take and reuse. In my case I bought structural LVLs and scraped them back and used them as joists. 1 5150 |