Browse Forums Building A New House 1 Apr 06, 2018 9:22 am Just checking what is acceptable clean up before handover , we have alot of stuff that got dug into holes around house and buried like metal beams that will be a nice surprise later if we didnt find it , concrete bits ? Also what is the height of the door from the carpet of flooring that is acceptable , we have differing door heights from concrete subfloor ranging from 28 mm to 40 mm I have stone pavement (?) in my backyard around the pool. I have not tended to them and so there is moss growing on them. I intend to clean them but was wondering what the… 0 728 Building Standards; Getting It Right! We bought a house in 2015 advertised as a 7/2/2, 4br up, 3br down (7br), and to date, it’s a great house. However, we’ve just had it valued and it’s come in as a… 0 11986 8 6138 |