Browse Forums Building A New House Re: How long Kurmond Homes will take to build double story h 6Oct 24, 2017 10:53 am 1building @trimum How FRUSTRATING!!!! It is stressful....20 weeks behind,:shock: Can't get it what these builders are doing when it is time to perform... they are great in marketing though Yes it is so stressful I never thought a housebuild would be like this, you would think with all this extra time the quality would be amazing but it is far from that. A 40 page building inspectors report told us that. Our builder confirmed we were ‘half way through’ so instead of a projected handover this week we are looking at Easter handover if we are lucky. We bought land in Tallawong Schofields NSW size 30m X 12.5m and planning to get double story house build around 350 sqm. We are thinking about having premium inclusions… 0 4090 Hi, We have a single story MacDonald Jones house, on a waffle pod slab with steel frame. Are we able to build a second story extension? Other info is we are 900mm from… 0 8488 Hi Mofflepop, I would recommend finding a building designer to prepare plans, they should design to your specified budget. The benefit is you can tender the project out… 9 20426 |