Browse Forums Building A New House Re: Ausbuild Finlay 36 @ Kinross Road Thornlands 23May 21, 2018 6:53 am Land deposit: 17 Nov 16 Build contract: 17 Apr 17 Land settled: 16 June 17 BA: 23 June Slab: 3 Aug Frame: 21 Aug Enclosed: 10 Oct Fixing: 6 Nov PCI: 14 Dec Settlement: 21 Dec 17 https://forum.homeone.com.au/viewtopic.php?f=31&t=88597 https://forum.homeone.com.au/viewtopic.php?f=31&t=88597 Re: Ausbuild Finlay 36 @ Kinross Road Thornlands 25May 22, 2018 6:01 am Land deposit: 17 Nov 16 Build contract: 17 Apr 17 Land settled: 16 June 17 BA: 23 June Slab: 3 Aug Frame: 21 Aug Enclosed: 10 Oct Fixing: 6 Nov PCI: 14 Dec Settlement: 21 Dec 17 https://forum.homeone.com.au/viewtopic.php?f=31&t=88597 https://forum.homeone.com.au/viewtopic.php?f=31&t=88597 Re: Ausbuild Finlay 36 @ Kinross Road Thornlands 26May 22, 2018 6:02 am Land deposit: 17 Nov 16 Build contract: 17 Apr 17 Land settled: 16 June 17 BA: 23 June Slab: 3 Aug Frame: 21 Aug Enclosed: 10 Oct Fixing: 6 Nov PCI: 14 Dec Settlement: 21 Dec 17 https://forum.homeone.com.au/viewtopic.php?f=31&t=88597 https://forum.homeone.com.au/viewtopic.php?f=31&t=88597 Re: Ausbuild Finlay 36 @ Thornlands - Tiling commenced! 40Aug 19, 2018 7:21 pm Some photos of the tiling... Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Floor plan of main bedroom and ensuite/WIR Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Main ensuite - toilet top right, left wall is feature dark tile with free standing oval bath. Pipe in floor is floor mount bath spout. Tap is on wall just under niche on left side (out of camera shot). Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Main ensuite shower (3.8m long) with 2 x ceiling mount rain showers. Wall on right is backside of bath wall and will be feature dark tile. All other walls will be light tile from floor. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Main ensuite - still waiting for vanity basins and bench to be replaced. Should have been oval basins that sit on top. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Second bathroom - Jack and Jill between bed 2 & 3. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Third bathroom - Jack and Jill between bed 4 & 5. This week the walls of bathrooms should be tiled. Painting prep is also to commence. Any advice on a builder in NSW who is demanding an extra 22000k after the house is completed and contract paid in full .Standard HIA contract. Never received a variation.… 0 20502 Can you give advice on how to get missing certificates needed for a form 21? Our bank requires us to provide one but we are missing 4 building certificates from our first… 3 71777 yes it does, you've just not understood it. theres a difference. 4 5314 |