Browse Forums Building A New House Re: Ausbuild Kinross Road - Thornlands 2Oct 19, 2017 1:52 pm Land deposit: 17 Nov 16 Build contract: 17 Apr 17 Land settled: 16 June 17 BA: 23 June Slab: 3 Aug Frame: 21 Aug Enclosed: 10 Oct Fixing: 6 Nov PCI: 14 Dec Settlement: 21 Dec 17 https://forum.homeone.com.au/viewtopic.php?f=31&t=88597 https://forum.homeone.com.au/viewtopic.php?f=31&t=88597 Re: Ausbuild Kinross Road - Thornlands 7Feb 26, 2018 5:35 am Land deposit: 17 Nov 16 Build contract: 17 Apr 17 Land settled: 16 June 17 BA: 23 June Slab: 3 Aug Frame: 21 Aug Enclosed: 10 Oct Fixing: 6 Nov PCI: 14 Dec Settlement: 21 Dec 17 https://forum.homeone.com.au/viewtopic.php?f=31&t=88597 https://forum.homeone.com.au/viewtopic.php?f=31&t=88597 Re: Ausbuild Kinross Road - Thornlands 10Mar 22, 2018 2:19 pm Land deposit: 17 Nov 16 Build contract: 17 Apr 17 Land settled: 16 June 17 BA: 23 June Slab: 3 Aug Frame: 21 Aug Enclosed: 10 Oct Fixing: 6 Nov PCI: 14 Dec Settlement: 21 Dec 17 https://forum.homeone.com.au/viewtopic.php?f=31&t=88597 https://forum.homeone.com.au/viewtopic.php?f=31&t=88597 Re: Ausbuild Kinross Road - Thornlands 12Mar 22, 2018 5:34 pm Land deposit: 17 Nov 16 Build contract: 17 Apr 17 Land settled: 16 June 17 BA: 23 June Slab: 3 Aug Frame: 21 Aug Enclosed: 10 Oct Fixing: 6 Nov PCI: 14 Dec Settlement: 21 Dec 17 https://forum.homeone.com.au/viewtopic.php?f=31&t=88597 https://forum.homeone.com.au/viewtopic.php?f=31&t=88597 Re: Ausbuild Finlay 36 @ Kinross Road Thornlands 16Apr 20, 2018 9:01 pm Slab piers poured! 20 April 2018 - piers were poured today for the slab which is due to be installed 27 April. However with the weather we are having in Brisbane at the moment I doubt this date will be met. [img=215x287]https://forum.homeone.com.au/u/80618_1524221821.jpg[/img] Slab piersThe rear of the house will be 2300mm from the edge of the pool coping. Far enough away to avoid any extra build costs!Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ 1 comment ⋅ Pin to Ideaboard ⋅ Re: Ausbuild Finlay 36 @ Kinross Road Thornlands 17Apr 23, 2018 9:12 pm 23 April 2018 update - Plumbing and drainage being installed. Looks like a bomb has gone off! Slab is due to be poured this Friday (27 April). Heaps of rock on site. 'S' class site with bedrock about 400mm down. Should be very stable! Plumbing and Drainage23 April and the site works getting ready for slab in four days.Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Under construction Piers and before plumbing and drainagePiers are in but before plumbing and drainage.Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Re: Ausbuild Finlay 36 @ Kinross Road Thornlands 18Apr 27, 2018 10:37 pm Slab was poured today. All went well. Waffle pod with 28 piers into rock. S class soil but M class waffle pod construction. Starting to pump concreteThe wide channels are for load bearing lower floor walls.Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Almost finished!Light trowel screed and before the helicopter finish.Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Late in the dayBoxing removed the same day. Our file has been moved over to construction crew so next stage is framing and roof...Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Re: Ausbuild Finlay 36 @ Kinross Road Thornlands 20May 11, 2018 9:11 pm What a difference a week makes. Met the site supervisor on Tuesday. This was also the day the frame was due to start but rain intervened. SS is youngish but knowledgeable and seems a good trades-person. He wants the best build for us and gave some great advice, ideas and direction for the construction phase. First impressions were great. Anyway, frame started on Wednesday and by Friday the upper level was in and about 1/3 roof trusses. Looking great so far! Upper level frame - 11 May 18Third day of frames and the upper story is in and 1/3 roof trusses.Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Upper level frame - 11 May 18Side view - hard to imagine the finished product when viewed in this state!Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Any advice on a builder in NSW who is demanding an extra 22000k after the house is completed and contract paid in full .Standard HIA contract. Never received a variation.… 0 20509 Can you give advice on how to get missing certificates needed for a form 21? Our bank requires us to provide one but we are missing 4 building certificates from our first… 3 71806 yes it does, you've just not understood it. theres a difference. 4 5322 |