Just wondering if anyone is able to shed any light on the info contained within it. It is all greek to me
Here goes
Is a re-establishment survey required - Yes
Subdivision - Under construction
Site levels - unsettled
Any trees on site - no
Services - nothing under construction
Road - nothing built
Site classification - Classified as P
Footing reccomendations - Waffle Pod Footing System - remove surface fill to a depth not less than 100mm and exsisting and any additional fill material to be placed is to conform with (blah blah) and not to exceed 300mm
The waffle PFS is to be founded onto the exsisting controlled fill or placed fill the slab is to be a minimum of class "H-D" dimension and reinforcement
An allowable bearing of 60KPA may be adopted.
Provide movement tolerant plumbing conections.
Borelog sheet
Hor Fill
Moisture content Damp
Soil description Fill - silt grey browns
Hole mm 0-100
Hor Fill
Moisture content Damp
Soil description Fill Clay silt grey browns and browns moderately to well compacted
Hole mm 100-2300
Hor B
US CH
Moisture content Damp
Soil description - Clay silty dark grey brown to grey brown very stiff end of test
Hole mm 2300-2500
I think that is the important stuff I could be wrong. If any other info is needed please advise.
I just thought someone on here might know what the hell it all means so I can either start freaking out or relax.
(any approx idea of costs would also be welcome )
Hi
I would be allowing 18,000 for site costs with this company and the specifications that you've mentioned.
hope this helps!