Browse Forums Building A New House Re: Simonds - Display options price list 2Sep 16, 2017 10:57 pm Do you mean the selections gallery upgrade options/options for in your gallery choices? So far as we experienced there wasn't any overarching list - as you go through gallery and a lot of the more simple upgrades (ie: shower heads, ovens, etc) choices the gallery consultant is able to quote as you go through and the rest is confirmed during the gallery appointment. You find out on the day all the gallery expenditure and can go back and forth throughout the appointment should it be above your budget/want to add or cut things based upon it throughout the day. All of your choices at the gallery are confirmed on the day or subsequent day, and everything is confirmed and set price wise before contract. I ran into trouble finding a lock that would fit my particular door, like your situation with your pivot door. I wanted a safe lock that couldn't be messed with easily. 4 25683 Standard uninsulated double brick has an R value of around 0.7. An insulated standard 90mm stud timber frame can have an R value of around 2.7. Even if you insulate a… 17 10134 Hi there, I'm a conplete newbie to this, but I'm looking to put a floor down in my 6x9m shed. It's currently sitting on a 100mm thick concrete perimeter (dirt floor… 0 4442 |