Browse Forums Building A New House Re: New House Build KDR Blackwood SA Fairmont Homes 'The Gra 76May 10, 2018 10:36 pm Hi Em pci went great, we found a handful of minor details that needed attention like paintwork defects and other chips and scratches but only one major thing that needed to be replaced and that was a panel in our walk in robe had a screw coming thru to the outside from the draw runner. Handover we had planned to be at 2pm at our house but got changed to the Fairmont office at 830am. The appointment took 20 mins was pretty simple just signed some documents and they gave us the keys We couldn’t go to the house until after 530pm though because the cleaners hadn’t been to the house yet. We had pizza in our house with some family and walked through the house We found that the one of the light switches didn’t work at all in the lounge room we tested the globes and they worked fine Also found that after pci the gas fitter came in and installed the gas lines and caused one of our draws to not close properly. The draw has since been fixed but the light hasn’t but that’s getting fixed on Monday Also on Monday our flooring is getting started so a very exciting few days coming up. We should be moving in over the next weekend! Re: New House Build KDR Blackwood SA Fairmont Homes 'The Gra 78May 12, 2018 7:18 pm Pictures will come once the flooring starts on Monday ! Re: New House Build KDR Blackwood SA Fairmont Homes 'The Gra 80Jun 15, 2018 2:18 pm Flooring done was done a few weeks ago. We have lived in our new house for about 3 weeks now. All our furniture is done and the blinds finally got finished and installed yesterday. Pretty happy with everything but there has been some dramas with some things Fairmont have done we have 6 months after handover to iron out things our list isn’t that long but a few things are fairly bad Overall though Fairmont homes have been good to deal with you have to chase them a bit to get things done but they have fixed everything that we have asked them to will see if the 6 month follow up is painful or not If there is anything exactly you would like me to take a photo of let me know. I know some people wanted to see some specific things but I can’t remember what they were let me know and I’ll get some pics for you Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Hi, I am looking into doing a KDR in Melbourne and am contemplating using Kialla Homes. I am looking for feedback on them from others who have built with them. 0 8204 We were lucky in that our old house was so small (86 square metres) compared to the new house, they were able to take enough readings around the old backyard house before… 8 24883 |