Browse Forums Building A New House 1 Sep 08, 2017 10:17 am Hi all, My builder just quoted me $5000 to upgrade to 3 phase for our currently constructed house in Melbourne. That's from the street to the house (less than 10 metres). He said it's going to cost more later. I plan to do it after hand over before I lay down the concrete. Is it really going to cost more to do it later? Thanks 1 62023 yes it is possible but watch for noise transmission, decouple as best you can. Maybe wider top and bottom plates with 70mm studs to allow the cabinet to be recessed fully 1 6636 You can wash over existing pavers with 10% solution of water and hydrochloric acid, then wash off. The acid will provide for required bond key with new concrete. 1 36960 |