Starting our KDR journey Metricon Glendale 50
Page 1 of 10
Any advise or links to useful topics for us will be greatly appreciated.
Thank you
I am building the doulton.
Have signed the final contract waiting for final variations.
Yet to recieve the my metricon login
But to tell the truth I probably do not need it.
I drive past the site everyday to work so I will be able to see what is happening.
The glendale seems to be very popular on the forums.
Good luck with the build
I am building the doulton.
Have signed the final contract waiting for final variations.
Yet to recieve the my metricon login
But to tell the truth I probably do not need it.
I drive past the site everyday to work so I will be able to see what is happening.
The glendale seems to be very popular on the forums.
I am building the doulton.
Have signed the final contract waiting for final variations.
Yet to recieve the my metricon login
But to tell the truth I probably do not need it.
I drive past the site everyday to work so I will be able to see what is happening.
The glendale seems to be very popular on the forums.
Good luck with the build
I am building the doulton.
Have signed the final contract waiting for final variations.
Yet to recieve the my metricon login
But to tell the truth I probably do not need it.
I drive past the site everyday to work so I will be able to see what is happening.
The glendale seems to be very popular on the forums.
I am building the doulton.
Have signed the final contract waiting for final variations.
Yet to recieve the my metricon login
But to tell the truth I probably do not need it.
I drive past the site everyday to work so I will be able to see what is happening.
The glendale seems to be very popular on the forums.
How is your build going? I just finished Electri cal n exterior.
Now have interior tiles n pc signing
Good luck with the build
I am building the doulton.
Have signed the final contract waiting for final variations.
Yet to recieve the my metricon login
But to tell the truth I probably do not need it.
I drive past the site everyday to work so I will be able to see what is happening.
The glendale seems to be very popular on the forums.
I am building the doulton.
Have signed the final contract waiting for final variations.
Yet to recieve the my metricon login
But to tell the truth I probably do not need it.
I drive past the site everyday to work so I will be able to see what is happening.
The glendale seems to be very popular on the forums.
How is your build going? I just finished Electri cal n exterior.
Now have interior tiles n pc signing
Must be exciting with light at the end of the admin tunnel, and great to have the demo all sorted. Good luck with the site start.
Must be exciting with light at the end of the admin tunnel, and great to have the demo all sorted. Good luck with the site start.
Yes its is....thanks....where r u with yoir build? Hows it going?
Signed the "Estimate - PC" yesterday to lock in all the options, so the documents and our deposit will go to head office this week. Soil tests organised by M have been arranged for tomorrow. Potentially I should start my own build thread soon
Must be exciting with light at the end of the admin tunnel, and great to have the demo all sorted. Good luck with the site start.
Yes its is....thanks....where r u with yoir build? Hows it going?
Signed the "Estimate - PC" yesterday to lock in all the options, so the documents and our deposit will go to head office this week. Soil tests organised by M have been arranged for tomorrow. Potentially I should start my own build thread soon
Must be exciting with light at the end of the admin tunnel, and great to have the demo all sorted. Good luck with the site start.
Yes its is....thanks....where r u with yoir build? Hows it going?
Signed the "Estimate - PC" yesterday to lock in all the options, so the documents and our deposit will go to head office this week. Soil tests organised by M have been arranged for tomorrow. Potentially I should start my own build thread soon
We received our final plans and contract variation. There was still one Provisional Figure which my CSC said will be only sorted at final settlement.
We got contacted by the Building Support Coordinator who advised our temp fencing is due to arrive on 3rd May.....Yay!
For those with private inspectors when do u send the final plans to him ....is it as soon as u get it and is that review part of the 1st pre pour slab inspection check or is it a separate cost?
How long does it take to start on site and approx when is the 1st Invoice received from site start....just so I can be organised with my bank.
Also what did u send to yhe inspection company before pre pour inspection stage
Also what did u send to yhe inspection company before pre pour inspection stage
[/quote]
Related
24/01/2024
0
Any advice on how to ensure the kit home granny flat that im thinking of buying will get council approval. The kit home companys wont release plans without a deposit and…
13/07/2023
2
DIY, Home Maintenance & Repair
Thanks for that!
28/09/2023
8
We were lucky in that our old house was so small (86 square metres) compared to the new house, they were able to take enough readings around the old backyard house before…