Our build has started this week with Valeco
We will be sharing some pics as we go!
Here is our floor plan:
Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅
We've a narrow block of 455sqm / 10.5m of frontage, so we've tried to maximize the space of the internal areas (220sqm which is 50% of the block = the max allowed by our building code).
Timeline:
01.03.2017 Land settled
18.03.2017 Deposit $1500 + $495 (pendant lights in kitchen paid in advance)
09.04.2017 Specification and sales plan signed
15.04.2017 HIA building contract signed
09.05.2017 Bank: construction loan approved
06.06.2017 Full draw signed
16.06.2017 Color selection appointment
20.06.2017 Submission to Council
13.07.2017 Council approval done + deposit 5% paid
19.07.2017 Site cut
28.07.2017 Slab done
[b]04.08.2017 Frame done![/b]