Browse Forums Building A New House Re: Statesman, Greenock MKII 161Oct 17, 2017 11:46 am was also told that we can use roller blinds with the slide doors if its 240cm wide then you just add 2 blinds of 120cm wide each which give you the option to just open the one where the door opens and leave the other one down, we have those panel blinds in rental and tbh we hate them not so sufficient as we thought when we first saw them they also break easy compared to other blinds , get stuck /break off from track, I saw some of them at ikea they call it something else but you do get different colours but are limited. we thought the double roller blinds because front bit is block out and back bit lets sun through which means it does the work of a lace curtain if I don't want the room to be blocked out the whole time. (unless we find other options) lace curtains is not an option for us (we hate it, want a type of blind that's easy to rinse or wipe off and clean) those zip blinds looks good, what is the price range? Re: Statesman, Greenock MKII 163Oct 17, 2017 4:39 pm Entilzha Interested in how you find both those styles of blinds as have the same concerns - though will probably go for an external roller Shutter for the bedroom at front for added security. I like the look of the panel glide blinds though - had not looked at them before now Roller shutter is a good idea! Not sure if it will fit in the budget to begin with though 😁 Re: Statesman, Greenock MKII 164Oct 18, 2017 12:53 pm Just got an email from Statesman saying pre handover in 4-6 weeks and the handover in 6-8 weeks. So I guess that means we will be moving in some time between 29th november and 13th December 😊 now we will be waiting for a call from the site supervisor to organise a walk through Re: Statesman, Greenock MKII 166Oct 18, 2017 2:17 pm Sarah159 Just got an email from Statesman saying pre handover in 4-6 weeks and the handover in 6-8 weeks. So I guess that means we will be moving in some time between 29th november and 13th December 😊 now we will be waiting for a call from the site supervisor to organise a walk through Wow! How many weeks in total? Re: Statesman, Greenock MKII 167Oct 18, 2017 2:26 pm lovisa Sarah159 Just got an email from Statesman saying pre handover in 4-6 weeks and the handover in 6-8 weeks. So I guess that means we will be moving in some time between 29th november and 13th December 😊 now we will be waiting for a call from the site supervisor to organise a walk through Wow! How many weeks in total? If its 8 more weeks, then it would be exactly 18 weeks from slab to handover Re: Statesman, Greenock MKII 168Oct 18, 2017 2:28 pm Entilzha grats. nice to have a confirmed date. hopefully no issues to delay it as getting close to shutdown my front window is 21-18 and i was quoted about 1k for a shutter for it. Yeh its pretty close to the wire! 😁 1k wow that is way less than i would have thought. Might have to look into getting a roller shutter then Re: Statesman, Greenock MKII 169Oct 18, 2017 2:29 pm Sarah159 lovisa Sarah159 Just got an email from Statesman saying pre handover in 4-6 weeks and the handover in 6-8 weeks. So I guess that means we will be moving in some time between 29th november and 13th December 😊 now we will be waiting for a call from the site supervisor to organise a walk through Wow! How many weeks in total? If its 8 more weeks, then it would be exactly 18 weeks from slab to handover Wow thats amazing! Our lease exp 25/2 so going on times your on we will be 20/2- 6/3 If it takes longer then we will store furniture and go camping for a bit! (Lol dint have family in Australia) but im confident it will be before our lease expires. (And taking into account the shutdown time) Re: Statesman, Greenock MKII 171Oct 18, 2017 3:09 pm Cant find the quote i was given so unsure who gave me these prices but this is what i was given back in the start of july for roller shutters (found them in my thread) - These are all Manual winders as I didnt look at the price for electrical ones 21-18 $975 manual 21-21 $1060 manual 18-15 $840 manual 18-15 $840 manual Re: Statesman, Greenock MKII 173Oct 18, 2017 4:13 pm The front window is 21-24, so might be like 1200$. Because we are on a corner block we had to have 2 thin vertical windows on the other wall of the bedroom aswell, not sure what we can do for those Re: Statesman, Greenock MKII 174Oct 18, 2017 4:15 pm lovisa Hope so Hubby went past our slab today and there was a teadie cutting and measuring things! I told him to take a photo he said no he does have a shirt on it will just look weird 😂 Hahah thats hilarious! Was he cutting the frame? Thats awesome! Was you slab last week or the one before? Re: Statesman, Greenock MKII 176Oct 18, 2017 4:39 pm Sarah159 The front window is 21-24, so might be like 1200$. Because we are on a corner block we had to have 2 thin vertical windows on the other wall of the bedroom aswell, not sure what we can do for those Ours are 18x12 we have 2 weird size! |