Browse Forums Building A New House Re: Statesman, Greenock MKII 163Oct 17, 2017 4:39 pm Entilzha Interested in how you find both those styles of blinds as have the same concerns - though will probably go for an external roller Shutter for the bedroom at front for added security. I like the look of the panel glide blinds though - had not looked at them before now Roller shutter is a good idea! Not sure if it will fit in the budget to begin with though 😁 Re: Statesman, Greenock MKII 164Oct 18, 2017 12:53 pm Just got an email from Statesman saying pre handover in 4-6 weeks and the handover in 6-8 weeks. So I guess that means we will be moving in some time between 29th november and 13th December 😊 now we will be waiting for a call from the site supervisor to organise a walk through Re: Statesman, Greenock MKII 166Oct 18, 2017 2:17 pm Sarah159 Just got an email from Statesman saying pre handover in 4-6 weeks and the handover in 6-8 weeks. So I guess that means we will be moving in some time between 29th november and 13th December 😊 now we will be waiting for a call from the site supervisor to organise a walk through Wow! How many weeks in total? Re: Statesman, Greenock MKII 167Oct 18, 2017 2:26 pm lovisa Sarah159 Just got an email from Statesman saying pre handover in 4-6 weeks and the handover in 6-8 weeks. So I guess that means we will be moving in some time between 29th november and 13th December 😊 now we will be waiting for a call from the site supervisor to organise a walk through Wow! How many weeks in total? If its 8 more weeks, then it would be exactly 18 weeks from slab to handover Re: Statesman, Greenock MKII 168Oct 18, 2017 2:28 pm Entilzha grats. nice to have a confirmed date. hopefully no issues to delay it as getting close to shutdown my front window is 21-18 and i was quoted about 1k for a shutter for it. Yeh its pretty close to the wire! 😁 1k wow that is way less than i would have thought. Might have to look into getting a roller shutter then Re: Statesman, Greenock MKII 169Oct 18, 2017 2:29 pm Sarah159 lovisa Sarah159 Just got an email from Statesman saying pre handover in 4-6 weeks and the handover in 6-8 weeks. So I guess that means we will be moving in some time between 29th november and 13th December 😊 now we will be waiting for a call from the site supervisor to organise a walk through Wow! How many weeks in total? If its 8 more weeks, then it would be exactly 18 weeks from slab to handover Wow thats amazing! Our lease exp 25/2 so going on times your on we will be 20/2- 6/3 If it takes longer then we will store furniture and go camping for a bit! (Lol dint have family in Australia) but im confident it will be before our lease expires. (And taking into account the shutdown time) Re: Statesman, Greenock MKII 171Oct 18, 2017 3:09 pm Cant find the quote i was given so unsure who gave me these prices but this is what i was given back in the start of july for roller shutters (found them in my thread) - These are all Manual winders as I didnt look at the price for electrical ones 21-18 $975 manual 21-21 $1060 manual 18-15 $840 manual 18-15 $840 manual Re: Statesman, Greenock MKII 173Oct 18, 2017 4:13 pm The front window is 21-24, so might be like 1200$. Because we are on a corner block we had to have 2 thin vertical windows on the other wall of the bedroom aswell, not sure what we can do for those Re: Statesman, Greenock MKII 174Oct 18, 2017 4:15 pm lovisa Hope so Hubby went past our slab today and there was a teadie cutting and measuring things! I told him to take a photo he said no he does have a shirt on it will just look weird 😂 Hahah thats hilarious! Was he cutting the frame? Thats awesome! Was you slab last week or the one before? Re: Statesman, Greenock MKII 176Oct 18, 2017 4:39 pm Sarah159 The front window is 21-24, so might be like 1200$. Because we are on a corner block we had to have 2 thin vertical windows on the other wall of the bedroom aswell, not sure what we can do for those Ours are 18x12 we have 2 weird size! |