Hi All, I am building with WA Housing and as expected they've added costs to siteworks quote (above the initial quote of 10k) for 'additional power run incl trenching above standard allowance' ($2874), 'additional sewer run' ($482), 'additional water run' ($220).
According to the survey, the power dome/meter are approx 32 metres from front of my new block. I have confirmed this is the reason for the power run cost.
Are these costs appropriate?
Thanks in advance for the advice.