Browse Forums Building A New House 1 Jul 12, 2017 5:02 pm Afternoon all, I'm working on a job with a suspended concrete slab for the ground floor level. The site is sloping, starting with slab on ground and the highest point off the ground level will be 1200mm. A couple of questions: 1. Is there a minimum ground clearance for suspended concrete slabs like there is with suspended timber framed floors? 2. Would it be cheaper to a) Have a 172mm suspended concrete slab, or b) have a 100mm concrete slab and fill in the subfloor with clean fill (turning the subfloor brick walls into retaining walls. Thanks Fair Trading can issue orders to rectify and complete but once the matter goes to NCAT these orders are automatically vacated. You will have to terminate contract and sue… 21 25408 How are you doing Ben? Extremely interested in hearing what you are doing or plan to do! 12 13378 The concreter will take and reuse. In my case I bought structural LVLs and scraped them back and used them as joists. 1 3528 |