Option 1
Offer slab, frame, lock up, fixing and final inspections for $2200 ish
Option 2
Offer slab, frame, lock up and final for $1500 ish
Both have taken the time to call me and provide example reports. Both are based local so it comes down to how important is a 'fixing' inspection? These can be reviewed during final inspection yes?
Fixing stage - mostly means checking waterproofing before wet area tiles are laid and so cannot reviewed during final inspection.
Don’t forget u should get pre- pour inspection to see that all form work is done as per engineering drawing before they pour concrete - slab is the next one and some check frame and slab at same time.
Based on the sample reports their 'slab' includes pre pour which is good. Good feedback on the waterproofing I will ask him.