Good that they changed the location of the tap. Was a bit weird having it next to the downpipe.
With the front pillar overhang, we’ve got the same issues. Did Henley provide the engineering report or did you push for them to have an engineer provide the solution?
So hard not being able to go inside and take photos. We’ve chosen the same stain for the stairs so again thanks for the progress photo.
Glad that your boy is ok and recovering from the stitches.
I don't think that they looked up to see where the downpipe was going to run when they did the tap, such a shame as it was in perfectly. The best thing tho is that our SS picked it up and we didn't have to say anything.
For the front pillar, when I was completing a walk through with our SS, he advised that it had to go to engineering to be reviewed, I just asked for the report to be provided. I just followed up via email so that there was a record of my request and it was sent through once the fix was completed as well as photos during the fixing. It all looks good now.
Not being able to see everything is the worst part, as for the photos I found that putting the phone right on the glass reduced the reflections and glare and you could get a decent pic. My hubby calls me a stalker of our build but then his job takes him past the house a couple of times a day, so it's a matter of pot calling the kettle black, from where I stand.. lol.
My son's recovering, but is having issues eating as he can't bite with his front teeth as their sore. He's such a trooper tho and we relented the other night and bought Maccas as it's so soft. He got out a knife & fork to chop it up. I'll be making a big pot of soup over the weekend with heaps of veg, chicken and noodles to get some goodness into him.