Browse Forums Building A New House Re: KDR - Henley Reserve (MainVue) - Aegean38 - Bricking! 289Dec 12, 2017 6:30 pm Nah Firsttime - they are prince of promises and weren't on site today I'm wondering if this is due to our pre-plaster inspection going ahead today. I'll keep the pics coming ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Pre - plaster report still has 12 items to be addressed from the last three inspections and we get to add another 15. Total of 27 at the moment. Whilst on site for the pre-plaster inspection hubby took some additional photos of the bricking. I'm concerned with the bricking in the garage and have raised this when I sent over our pre-plaster report tonight. Garage bricking - not sure why the boundary fence has not been removed to brick this. It's very attractive - Not what I would call display home standard..... Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Bricking around the front entrance and theatre room Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Side of the house behind the garage. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Dining room window at back of house Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ and finally - our lap pool is still in place...... Henley this is not managing water on our site..... did you not get the same contract as us?!?!? Guess our house is not fully wrapped - they can't get through the waterway. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Walkthrough still on track for Friday.............. oh and more sand delivered Let's see what the week holds Re: KDR - Henley Reserve (MainVue) - Aegean38 - Bricking! 290Dec 13, 2017 5:26 pm They are bricking fast. Wow That garage wall, are they doing it from the inside? Do they clear it up on the outside later? Has your lap pool dried up today? Ours isn't looking too bad today. Hopefully it stays dry for a bit. SS said once we lock up they come back on site, clean it up and bring in some more dirt/soil to back fill. Re: KDR - Henley Reserve (MainVue) - Aegean38 - Bricking! 291Dec 13, 2017 5:36 pm No bricking today Bri - too hot. They are doing the garage from the inside, don't know how they are going to clean up for the outside as they told me today that they are not planning on removing the fence. Lap pool photo is from yesterday and it's still muddy today. The brickies did throw down some mortar into the water but...... I'm glad yours is drying out, and that you have been provided info for what they are going to do later. How was your walkthrough? Re: KDR - Henley Reserve (MainVue) - Aegean38 - Bricking! 292Dec 13, 2017 9:38 pm Yeah can't blame them, it was hot. Thankfully tomorrows weather has been revised to 25. I thought they did something like acid washing them to clean them up?! LOL ours still looks soft. The guys have thrown down bit and pieces of wood offcuts etc to step on. Walk through went well. Turns out we've had some delays due to thefts. Guys have been turning up to work to find timber stolen. But from what I got from the chat, defects should be sorted in the next couple of days (as long as nothing else is stolen I'm assuming. Brickie is going to start and work through till Christmas. Powerpoints in the garage will be moved up, yay. Re: KDR - Henley Reserve (MainVue) - Aegean38 - Bricking! 293Dec 15, 2017 6:02 am 13 Weeks ago we were handed to Constructions stage. Have walkthrough with SS today so we'll go over the house. Am actually looking forward to finally meeting our SS. Wish him luck LOL Re: KDR - Henley Reserve (MainVue) - Aegean38 - Bricking! 294Dec 15, 2017 6:22 am Rachael13 13 Weeks ago we were handed to Constructions stage. Have walkthrough with SS today so we'll go over the house. Am actually looking forward to finally meeting our SS. Wish him luck LOL Oh haven’t you met him yet? Yeah good luck to him, sounds like he’s going to need it, lol Re: KDR - Henley Reserve (MainVue) - Aegean38 - Bricking! 295Dec 15, 2017 12:59 pm Met our SS today and we went through Darbecca's last report, which was great. There are a few items that won't be fixed till later in the build, I get this and these items are; water management which is an ongoing item, roof alignment will be fixed once the scaffolding is installed for the brickies. Gutter and fascia damage will be fixed before handover. Structural issues are all fixed as well as framing. Plumber needs to come back to check why the storm water is not draining and put CCTV down the pipes.. Insulation guys were onsite packing the walls and roof cavity, and ensuring that the wrapping was all water tight as there were sections missing and gaps. Brickies were no where to be seen, but should have been onsite according to the SS. Whilst the garage wall is being bricked overhanded, the outside wall will be washed down with the rest of the house. I'll need to contact the neighbours closer to the time as the brick washers will need to be on their property and hang over the fence for this to be done Some of the tradies will be working through the Christmas period but SS is taking time out. Asking for an estimate timeframe for completion and we are looking at the house being ready in May. I reckon that this is better than July. I did almost drool when I saw the bath hob in the ensuite.... Few pics What will eventually be the kitchen with butlers pantry on the left. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Driveway side of the house. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Re: KDR - Henley Reserve (MainVue) - Aegean38 - Bricking! 296Dec 16, 2017 3:36 pm We are still a little undecided on what we want for flooring so went to another shop to review our options. We have narrowed it down to Spotted Gum for the laminate and we are still in love with the salt n pepper carpet for upstairs. What we need to do now is work on the brands that we like and then compare prices. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ This afternoon we went to a furniture studio to review fabric chesterfields and have a colour consultant assist us, I'm hopeless at putting colours together. We ending up buying what we wanted. Couches are very comfy, hubby approved for the depth of the seat, and I get the softer look for the chesterfields. What we are a little unsure of is whether we want the round ottoman or to change it to a square tufted one. I'm thinking of keeping the round ottoman as I can put this into my dressing room and we can get the square ottoman later for the lounge. We bought two chairs in linen, two 3.5 seaters couches in velvet, and the round ottoman also in linen, colours as below. They will be ready for delivery in 13 weeks, and might be able to be held for another 6 after that. I'm hoping that these are delayed Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ So this will be our "extra" Christmas present to each other...... 🎅🏻🎅🏻🎅🏻🎅🏻 We also had to go past the house as stalkers do and majority of the installation is completed. Re: KDR - Henley Reserve (MainVue) - Aegean38 - Bricking! 297Dec 17, 2017 10:28 am Loving the couches, very nice. We need to go looking after Christmas. Flooring choices look great. Love the spotted gum. Hope the rest of the issues with the build are sorted soon. Re: KDR - Henley Reserve (MainVue) - Aegean38 - Bricking! 298Dec 19, 2017 4:54 am Bricking and plastering is now happening on site. Our front piers had to be torn down as the bricking was not correct and they have restarted again. Our SS has had to go back to the powers to be, as the foil was not installed on our external garage wall and the insulation batts have been installed. As this is a 6 star energy requirement, there is no way that it can be left like this. This is the little piece that told us there was no foil on this wall . . Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Watch this space to see what happens next Re: KDR - Henley Reserve (MainVue) - Aegean38 - Bricking! 299Dec 19, 2017 4:56 am Bri1234 Loving the couches, very nice. We need to go looking after Christmas. Flooring choices look great. Love the spotted gum. Hope the rest of the issues with the build are sorted soon. I'm a little concerned on the velvet for the couches but I think that I'm just over thinking the furniture. Hoping that it's not to heavy in the new lounge. The chairs are in linen so that should be ok. I didn't think that I'd be this concerned with what the couches look like, as I never have before. lol Re: KDR - Henley Reserve (MainVue) - Aegean38 - Bricking! 300Dec 20, 2017 7:12 pm With the rain last night our lap pool is back... Plasters are in the house and I think that they have hung everything upstairs. They have started the ceiling in the open plan area downstairs and also the butlers pantry.. Bricking continues SS is trying to get the house to lock up before the break but has advised us that tradies will continue to work over the next few weeks, even though Henley is going on holidays. Here's some updated pics. House from the back.... Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Alfresco .... bricking under the stackers. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ The return of the lap pool, due to the amazing water management that is being maintained at our site. See how the yellow temp downpipe connects beautifully to the white storm water pipe Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Finally the side of the house from behind the garage. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ I got chatting to the neighbours and forgot to take a pic of the front of the house. Ooops lol..... We were lucky in that our old house was so small (86 square metres) compared to the new house, they were able to take enough readings around the old backyard house before… 8 37160 The biggest challenge will be if you take out a loan and then run out of money - you'll have an incomplete security and lenders do not like this so you can get stuck.… 2 19114 Hi, I am looking into doing a KDR in Melbourne and am contemplating using Kialla Homes. I am looking for feedback on them from others who have built with them. 0 13450 |