Browse Forums Building A New House Re: Site supervisor 2May 10, 2017 7:07 am I actually thought they would be more hands on with us. I expected that once a stage was complete our SS would contact us to organise an inspection. However we receive the bill and that's how we know it's complete. Then we have to call to arrange an inspection. He refuses to work outside of 8-4 therefore for every inspection both my husband and I have to take time off. I know next door to us do after hours and I honestly expected we could do the same. Re: Site supervisor 3May 10, 2017 7:50 am asha27 I actually thought they would be more hands on with us. I expected that once a stage was complete our SS would contact us to organise an inspection. However we receive the bill and that's how we know it's complete. Then we have to call to arrange an inspection. He refuses to work outside of 8-4 therefore for every inspection both my husband and I have to take time off. I know next door to us do after hours and I honestly expected we could do the same. Ours is a shocker I am not sure whether Perth has its own way of doing things in regards to this. Most of Perth has class A (sandy soil), except for some areas near rivers or hills. 2 13063 We were lucky in that our old house was so small (86 square metres) compared to the new house, they were able to take enough readings around the old backyard house before… 8 37085 |