Hi, no confirmed date but SS is aiming to finish by month end. We’re locked out so I can’t confirm exactly what is done or not.
I know roof service was carried out. Painting patch ups were done inside and out. 1 piece of window glass replaced (optical manufacturing fault). Missing linen shelving installed.
Still have to do
-Down pipe fix
-replace damaged flyscreen
-rear garage door tracks repair
-kitchen flyscreen doors
-csd adjustments, stop and pull kits
-sliding door adjustments
-incorrect vanity mixer
-incorrect drains
-turn a GPO upside down
-minor concrete patching
-appliances/hws/aircon
Things seem to be getting nasty in the office. I queried the final variation they hit me up for earthworks provisional allowance. I asked them to justify it as our SS at the time advised an amount that was way lower than currently claimed. Now for the first time, I am getting the no email reply, phones not being answered. Our previous CSOs were always reachable, always helped to find an answer, nothing was too hard. So because they are not responding, I don’t have a final variation and therefore no final invoice yet.
I know roof service was carried out. Painting patch ups were done inside and out. 1 piece of window glass replaced (optical manufacturing fault). Missing linen shelving installed.
Still have to do
-Down pipe fix
-replace damaged flyscreen
-rear garage door tracks repair
-kitchen flyscreen doors
-csd adjustments, stop and pull kits
-sliding door adjustments
-incorrect vanity mixer
-incorrect drains
-turn a GPO upside down
-minor concrete patching
-appliances/hws/aircon
Things seem to be getting nasty in the office. I queried the final variation they hit me up for earthworks provisional allowance. I asked them to justify it as our SS at the time advised an amount that was way lower than currently claimed. Now for the first time, I am getting the no email reply, phones not being answered. Our previous CSOs were always reachable, always helped to find an answer, nothing was too hard. So because they are not responding, I don’t have a final variation and therefore no final invoice yet.
Good new that your SS has a goal to finish by end of the month.
After talking to my SS ... I feels he does not have any idea on when the house will finish.
Very reluctant to give approximate time.
We have not communicate with CSO. Wonder how they will treat us later.