It's a 3 phase 20kw system so will chew the power for sure I hope that was a quarter, our last rental had an older single phase Daiken ducted and a pool and we did over $700 a month for 2 months!! I'm hoping the newer systems are more efficient lol. We are going to wait until we get our first few bills before deciding on solar.......living in hope maybe the house will get some cooling breezes.
Spent all day there yesterday and got most of it done then remembered noggins for ceiling fans. Managed to get a couple done and hoping plasterboard will start next week so I can finish off over the weekend, if not then I'll be a roof rat doing the rest of them, some will have to wait until after the aircon counters are installed. I have a healthy respect for how quickly tradies get things done, although I'm a measure 3 times, think about it recheck then cut and still get it wrong.
How are things going for you?
Managed to catch the framing guys onsite one day and they did TV noggins in 4 rooms last week.
Oohhh thanks for the pics Craig, the raised portico looks fab. I'm really excited to see it started. Between yourself and Henry I'm getting hints of who mine should look .
Omg your power bill is worse than mine holy hell. Yes 3 phase ducted is much better to run but still likes to gobble the power, we might do well with solar .
Good on your for getting out there and getting so much done, the less time you have to spend stuck in a hot ceiling cavity the better. Hehhehe least your thorough with your measuring and cutting, I'm a bit the same and Mr T laughs at me .
Getting there slowly on my front, sorted out the fridge, ducted quote due back along with everything else it's just the waiting game on quotes and info
No probs, the elevations don't really do it justice and Coral don't show it on their website anymore. I did have an old design book showing it, but that has either been thrown out or is buried in one of the moving boxes somewhere in the garage.
Yes, hoping to not have bills like that again.
I will probably be up there when the down lights are getting done tho but hopefully it will be in winter.
Good to hear, hoping to see your build starting soon. A new fridge......very nice, think it's about time we get one when we move......will just have to see how much money is left over haha