I just had a landscaper come and do a cut and level to all 4 sides to pre top soil level. Plus cut additional 200mm past side boundaries for fencing and ag liens. There was a ton of clay and builders rubble so it was well worth saving my back. Spoil was left onsite. $1400 He’s based in Oran Park I think - Southern sun landscapes.
Our Acacia Home
Page 40 of 49
ehhc I will ask your landscaper to come and quote, what are you doing with the spoil ehhc? Is it expensive to have removed?
We need the fence up so concreter can lay paths to boundary. But neighbour has a broken down pipe that is causing water to flow directly to mine so I need the plumbing fixed before we put up the fence
Thanks very much I’m going to do what shazaw has done and split the jobs and get separate quotes.
ehhc I will ask your landscaper to come and quote, what are you doing with the spoil ehhc? Is it expensive to have removed?
ehhc I will ask your landscaper to come and quote, what are you doing with the spoil ehhc? Is it expensive to have removed?
Why are you awake at 3.15am in the morning?
Our backyard is 50m2 and the front yard will be a courtyard with just the grass on the footpath. I think our cost will be coming from doing the raised rendered garden beds, fence and driveway.
Thanks very much I’m going to do what shazaw has done and split the jobs and get separate quotes.
ehhc I will ask your landscaper to come and quote, what are you doing with the spoil ehhc? Is it expensive to have removed?
ehhc I will ask your landscaper to come and quote, what are you doing with the spoil ehhc? Is it expensive to have removed?
Why are you awake at 3.15am in the morning?
Our backyard is 50m2 and the front yard will be a courtyard with just the grass on the footpath. I think our cost will be coming from doing the raised rendered garden beds, fence and driveway.
Insomnia
Too much on my mind!
I have split the jobs up and will get itemised quotes on those.
ehhc we have your landscaper coming on Saturday for a quote on earthworks and concreting a path.
Thanks very much I’m going to do what shazaw has done and split the jobs and get separate quotes.
ehhc I will ask your landscaper to come and quote, what are you doing with the spoil ehhc? Is it expensive to have removed?
ehhc I will ask your landscaper to come and quote, what are you doing with the spoil ehhc? Is it expensive to have removed?
Why are you awake at 3.15am in the morning?
Our backyard is 50m2 and the front yard will be a courtyard with just the grass on the footpath. I think our cost will be coming from doing the raised rendered garden beds, fence and driveway.
Insomnia
Too much on my mind!
I have split the jobs up and will get itemised quotes on those.
ehhc we have your landscaper coming on Saturday for a quote on earthworks and concreting a path.
I do the same and ours is only half finished. LOL!!
Good idea about splitting the jobs, you will probably save a lot of money.
We are going to start getting quotes this week too.
Out of the blue we get our final variation!
Check it thoroughly. they charged us on things that were never done and things they should have charge ...they did not charged.
It is a pain to get separated quotes but it's worth it ... end up saving more.
Build Thread : viewtopic.php?=31&t=81624
We are getting landscape and fencing quotes at the moment, we are finding quite different things being suggested but have decided to turf and source plants ourselves to keep costs down so just need the professionals for excavation, levelling, topsoil and retaining wall/edging.
One thing we are deliberating over is the corner nature strip, the council is due to put a path down so we don’t want to go to the expense of turfing this when the council will dig it up. Unfortunately we could be waiting a long time for them to do this!
On other house news the driveway is STILL not down, we have now been given a 7th date which is Monday for this to be poured. The pergola damage is all fixed and just needs painting apparently this will be Monday too. Now the doors are giving me anxiety!! The front door is still very loose and the extra mortar lock on the rear door needs to be put on. I mean..how much time do they need!! The microwave trim is still not done...SS said they are ‘waiting for the supplier’ I’m not sure we will ever see it
Our nature strip has overgrown lawn we needs to tame it down. We have to wait and see how much will be destroyed during digging concrete footpath.
Build Thread : viewtopic.php?=31&t=81624
We received our final invoice which I agree with and....the driveway is DONE! Well nearly it needs the cobble header (stencil pattern) around the perimeter. However I actually think we will have PCI on Friday!! I can’t believe it!!
Two things happened today...
We received our final invoice which I agree with and....the driveway is DONE! Well nearly it needs the cobble header (stencil pattern) around the perimeter. However I actually think we will have PCI on Friday!! I can’t believe it!!
We received our final invoice which I agree with and....the driveway is DONE! Well nearly it needs the cobble header (stencil pattern) around the perimeter. However I actually think we will have PCI on Friday!! I can’t believe it!!
FINALLY!!! Fingers crossed.
Feeling deflated today, I spoke with the SS first thing and he confirmed PCI at 9am Friday.
Pretty sure the stencil and colour is meant to be applied before the concrete dries. Refund.
Perhaps it’s not fully cured yet and they still have to seal it? Might turn out nicer
Sorry to hear that the driveway isn't really what you want.
I'll keep my fingers crossed for not many problems found during your inspection.
I just don't know how my driveway will turn out tomorrow.
I do hope your PCI will be smooth run.
Build Thread : viewtopic.php?=31&t=81624
Related
3/03/2024
5
We already paid for somfy motors for the blinds. The quote above was purely for “pre-wiring” so the blinds company can install the motors and blinds. That’s why we…
8/11/2023
1
of course there are legal avenues. You've already mentioned it. Sue them. I find it odd that lawyers wouldnt be willing to take on the case, given CCT evidence and…
22/01/2024
36
"Losers" "humanity" "off time" "your" "top notch" "love symbol" Sounds like ponzo is done using other people's toilets