But there are stil fittings to be installed. Like downlighting, skirting is not compete, not all doors, not all cabinetry, no stone, no taps no toilets, no shower screen or taps or sinks. Which is all the fittings is that correct?
viewtopic.php?t=86597
We got ours too soon too. Due to be paid Monday, we are meeting with our SS on site on Monday to check what’s completed by then but the invoice was definitely raised before completion of fixing stage requirements. Fixing is meant to be plaster complete, skirts and architraves, internal doors, cabinetry fixed, troughs sinks and basins fitted, garage complete excluding roller doors. Downlights, stone, taps, toilets, shower screens don’t have to be completed yet as far as I’m aware.
I thought that too. But apparently not. Ss said everything that’s part of fixing stage should be done all next week. I can’t complain in a way as my ss has been so good. And he usually sticks too everything he says. Even my private inspector is very impressed with him. How clean his kept the site and quality the whole build is and he can’t believe how quick the build went and with such great quality.
viewtopic.php?t=86597