MarkPus
looks good... lots of cracked tiles on garage...
yes. They left a crate of tiles out front. I think they plan to redo it. I need a drone to inspect each and every tile. The dark tiles make it hard to find cracks from far.




NabeelC | Metricon Merricks 38 | Queensland
http://forum.homeone.com.au/viewtopic.php?f=31&t=86276
Great progress! Them tiles look very nice!
dulie
Great progress! Them tiles look very nice!
thanks Dulie





NabeelC | Metricon Merricks 38 | Queensland
http://forum.homeone.com.au/viewtopic.php?f=31&t=86276
Looking good!! They will do a tile service once scaffolding is all down and replace any cracked ones. Not sure what happens if it rains before then



kylz4
Looking good!! They will do a tile service once scaffolding is all down and replace any cracked ones. Not sure what happens if it rains before then


Thanks Kylz4. Good to know they will fix the tiles without a push from me. Brisbane did storm heavily yesterday. Water has ponded around my slab and everything outside is wet. But there is no leak inside. I think it's because of the Sarking.




NabeelC | Metricon Merricks 38 | Queensland
http://forum.homeone.com.au/viewtopic.php?f=31&t=86276
Was out of town for work during the week. It's such a roller coaster of emotion to see the progress.

M has installed stairs. Love the open thread. It let's so much light through from the back.










View of the future aquarium under the stairs from the living room



They installed all doors and trims. But they did not install the door handle. Realised it after I shut the door to take the picture. Had to get out of window onto the scaffolding and climb down ? This is probably why M discourages you from visiting your site without a supervisor.




Some damage to the front door sill from the heavy rain yesterday. Will M replace the entire door as it came as a package?



Rear roller door and corner stacker installed. I will be locked out soon






Waterproofing and leak test in ensuite. I see some water spots on ground floor below the ensuite. They better fix it good




Outside rendering almost done






NabeelC | Metricon Merricks 38 | Queensland
http://forum.homeone.com.au/viewtopic.php?f=31&t=86276
Awesome progress! Everything looking very nice!
dulie
Awesome progress! Everything looking very nice!
Thanks Dulie




NabeelC | Metricon Merricks 38 | Queensland
http://forum.homeone.com.au/viewtopic.php?f=31&t=86276
I love the nitch when your aquarium will go. I wish I thought if that. Always wanted an aquarium build inside the wall. Looking good. Progressing well.


Awesome progress Nabeel. Wow can't wait to see that gorgeous aquarium

Speeding along



Slight progress this week. Seems we will reach Finishing progress payment milestone by the end of March.

Tiles was delivered. Met with tiler on site to go over the plan. Good thing because he hasn't been able to get the tile layout plan from SM
so I gave him my print out.

The smart tiles installed in all wet areas. He has also levelled the wet floor area floors with cement.







Cabinets delivered and installation in progress. Got 2pac in Whisper white. The colour looks good so far. Can't wait to see it with the stone bench top.









Cladding and rendering on side and back are completed. The only thing left is cladding and rendering on the front. Guess they are waiting for the scaffolding to be removed.



.

Don't have pictures but looks like the electrician or carpenter has made a pass through. There are holes in all the places where the PowerPoint and switches will go.

SM messaged an update that painting is planned to start on 4th April. Hopefully they can finish painting before Easter which would mean PCI in May.




NabeelC | Metricon Merricks 38 | Queensland
http://forum.homeone.com.au/viewtopic.php?f=31&t=86276
Nabeelc
Slight progress this week. Seems we will reach Finishing progress payment milestone by the end of March.

Tiles was delivered. Met with tiler on site to go over the plan. Good thing because he hasn't been able to get the tile layout plan from SM
so I gave him my print out.

The smart tiles installed in all wet areas. He has also levelled the wet floor area floors with cement.







Cabinets delivered and installation in progress. Got 2pac in Whisper white. The colour looks good so far. Can't wait to see it with the stone bench top.









Cladding and rendering on side and back are completed. The only thing left is cladding and rendering on the front. Guess they are waiting for the scaffolding to be removed.



.

Don't have pictures but looks like the electrician or carpenter has made a pass through. There are holes in all the places where the PowerPoint and switches will go.

SM messaged an update that painting is planned to start on 4th April. Hopefully they can finish painting before Easter which would mean PCI in May.




NabeelC | Metricon Merricks 38 | Queensland
http://forum.homeone.com.au/viewtopic.php?f=31&t=86276



Gee that's abit slack of your Sm
. Good thing you turned up. It helps being a sticky beak lol.

Your house looks amazing. And don't worry you can't go wrong on a white kitchen.


Hi NabeelC,

Watching your build intently as my wife and I are in the pre-lim contract stage for a Merricks 37 to be constructed over the road at Augustine Heights!

Love everything you've chosen so far! We're a little jealous as our budget just doesn't allow for a lot of the stuff you've selected!

Good luck; shame about that cyclone but hopefully doesn't affect your build too much!
GMN_Merrick37
Watching your build intently as my wife and I are in the pre-lim contract stage for a Merricks 37 to be constructed over the road at Augustine Heights!

Love everything you've chosen so far! We're a little jealous as our budget just doesn't allow for a lot of the stuff you've selected!

Good luck; shame about that cyclone but hopefully doesn't affect your build too much!


Good to find another building a Merrick and just over the road too. Would love to follow your build. Good thing about Merricks 37 is the use of space above the garage to make the bedroom size bigger. Merricks 34/38/42 doesn't have anything above the garage.

Got a letter this week from M claiming 10 days extension due to rain in March. Guess today's cyclone will result in another extension.




NabeelC | Metricon Merricks 38 | Queensland
http://forum.homeone.com.au/viewtopic.php?f=31&t=86276
Visited my build yesterday. As I drive up, my first reaction is they removed all the scaffoldings and fence. Yay. I can finally see the whole house. Then I see they installed the garage door. And I think... I am locked out













NabeelC | Metricon Merricks 38 | Queensland
http://forum.homeone.com.au/viewtopic.php?f=31&t=86276
Looks fantastic! They must be out collecting fences today because they took mine away too, hehe.
Wow beautiful home NabeelC. Exciting stuff

I can't wait until our fences are gone lol


Looks great. At least you know when your locked out. It's getting close. Specially if they installed the front door





viewtopic.php?t=86597
Hi Nabeelc , your facade coming nice looking forward to see when it is complete. would you mind to share how much M charged for butt window? And how much was upgrade cost of stairs with glass bal (what was the credit and how much is the new stairs with glass). thanks.
The corner butt window was $2475. Not credit for window as the original facade doesn't have the corner butt window.

The stair was $12210. No credit as the description said 'in lieu of standard'. My stair is open risers with closed stringer with square nosing profile. Rebated glass and MET6 downturn handrail.

The same stair with steel balustrade instead of glass was 10K. The same stair with open stringer was quoted as $16K.





NabeelC | Metricon Merricks 38 | Queensland
http://forum.homeone.com.au/viewtopic.php?f=31&t=86276
Related
13/12/2023
0
Metricon Doulton Facade

Building A New House

Hi, First of all, thank you to this community for sharing your thoughts and opinions. We are in early days of our pre-contract stage for Metricon Doulton and we are…

29/01/2024
0
Metricon Homes - Delta Single storey

Building A New House

Hello All 🙂 We are planning to start our journey of construction our first home. We zeroed down on Metricon and henley homes based on design suitable for our lot and…

15/03/2024
0
Metricon Lumiere Colour Sceme

Building A New House

We don’t live in VIC so want to know the exterior colours of Lumiere display so we can see it at the paint shop. Not building with Metricon so my request went…

You are here
Building ForumBuilding A New House
Home
Pros
Forum