Browse Forums Building A New House Re: Cascade Q1 - Henley Homes with Mods 146Sep 16, 2017 6:31 pm aloenyx I'm glad to hear PCI went well Those issues sound fairly easy to handle. Your house is looking gorgeous!!! I love the bathrooms and kitchens, your colours are great together. I love the front colours too, the light coloured roof is awesome, I wish I went with one of those. Good news on your old house, but sounds super stressful!! Glad I didn't have to do anything like that. Ouch on that quote!! But good thing you had funds set aside. It will look amazing once its all done, your window dressing ideas sound a treat I love my shutters, even though expensive. Thanks Dawn. I agree totally about the shutters they are expensive but worth it IMO. Re: Cascade Q1 - Henley Homes with Mods 148Sep 16, 2017 6:46 pm So I had PCI on the 31st of August and still no word on a handover date. Most issues have been fixed but the floors need to be relaid once the levelling stuff has dried, drainage installed adjacent to garage and plaster/paint needs to be redone around the fixes. I just wish they could give me a date so I can let my driveway and blinds people know. Hit the shops today to cheer myself up and bought a lounge from Nick Scali Spring sale. I have been looking at lounges for over six months and been so indecisive can't believe I finally manage to choose one. The 12 week delivery period sucks, I was going to put the old lounge in the teen retreat so we will be sitting on beanbags for a while. Here is a pic of the display mine will be a different colour. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Re: Cascade Q1 - Henley Homes with Mods 150Sep 16, 2017 8:53 pm Wow it all looks amazing! Absolutely stunning! Re: Cascade Q1 - Henley Homes with Mods 151Oct 04, 2017 5:54 pm Tamara1975 Wow it all looks amazing! Absolutely stunning! Thank you . Re: Cascade Q1 - Henley Homes with Mods 152Oct 04, 2017 6:01 pm I finally have the keys , it's been 4 1/2 weeks since PCI. It took forever for some trades to come back and fix their work. I'm so glad I used Darbecca. Driveway will be getting started on Sunday and blinds installed next week. Time to start packing . Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Re: Cascade Q1 - Henley Homes with Mods 154Oct 16, 2017 4:47 pm aloenyx Congratulations!! I wondered where you had gone. So happy for you DD Wow, that is a long wait from PCI to handover. Hope moving goes smoothly for you!!! Thanks Dawn . It was a long time between PCI and handover but I'm glad that they fixed all the issues. Re: Cascade Q1 - Henley Homes with Mods 155Oct 16, 2017 5:03 pm I'm slowly getting closer to moving in. Busy week; blinds were installed in the minor bedrooms, driveway poured, acid washed and sealed, I put together my bar stools with an Allen key and started to move smaller items and boxes. I'm really happy with how the driveway turned out. There is still so much to do (and spend). Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Thankfully the bar stools were easy to assemble. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ I'm also pretty happy with how the blinds look, so glad I got pelmets. Hopefully the shutters will be ready to install next week. Sorry for the crap lighting, I haven't bothered buying extra globes because I'm swapping out the battens for downlights to match the rest of the house. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Re: Cascade Q1 - Henley Homes with Mods 157Oct 16, 2017 8:57 pm cant decide I'm slowly getting closer to moving in. Busy week; blinds were installed in the minor bedrooms, driveway poured, acid washed and sealed, I put together my bar stools with an Allen key and started to move smaller items and boxes. I'm really happy with how the driveway turned out. There is still so much to do (and spend). Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Thankfully the bar stools were easy to assemble. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ I'm also pretty happy with how the blinds look, so glad I got pelmets. Hopefully the shutters will be ready to install next week. Sorry for the crap lighting, I haven't bothered buying extra globes because I'm swapping out the battens for downlights to match the rest of the house. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Thanks Re: Cascade Q1 - Henley Homes with Mods 158Oct 21, 2017 2:29 pm zee1308 cant decide I'm slowly getting closer to moving in. Busy week; blinds were installed in the minor bedrooms, driveway poured, acid washed and sealed, I put together my bar stools with an Allen key and started to move smaller items and boxes. I'm really happy with how the driveway turned out. There is still so much to do (and spend). Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Thankfully the bar stools were easy to assemble. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ I'm also pretty happy with how the blinds look, so glad I got pelmets. Hopefully the shutters will be ready to install next week. Sorry for the crap lighting, I haven't bothered buying extra globes because I'm swapping out the battens for downlights to match the rest of the house. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Thanks Hi Zee the blinds are from CLH blinds and shutters, very well made, can't wait for the shutters to be installed. The concrete was $110 sqm, it was the most expensive mix Geostone has . Re: Cascade Q1 - Henley Homes with Mods 159Oct 21, 2017 2:34 pm Post build electrical fit off. I really love my powder room pendant but think it will look even better with an orange filament globe. I'm also really happy with the USB power point. Hopefully shutters will be ready next week. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Re: Cascade Q1 - Henley Homes with Mods 160Oct 21, 2017 6:22 pm Love the phone holder, where did you get that from? How much. How much for the blinds? Have you done fencing yet?? We are at frame stage and im trying to sort out a budget for expenses after we get the house and have no clue. Land deposit 14 Nov 2015 House deposit 4/9/16 Land title 15/5/17 Quote signed off 28/1/17 Colour selection 21/2/17 Tender appointment 28/3/17 Developer Building approval ??? Site start 11 July 2017 Hi, If you give a set of criteria as to what means 'good' to you, it'll give others prompts to respond. We considered Henley early on but there were two factors that… 1 10441 Ask for references and speak to them. If they are defensive or try to avoid the request, walk. 1 74688 I would never build with Fowler homes. I built with them in 2021 and till date maintenance issues are pending. All their existing trades and businesses don't work with… 14 105496 |